Sales Hotline

+86 731-88702064

Customer Service Hotline

+86-189 0076 2776

Email

marketing@ramon.com.cn

RAMON Intelligent Scheduling System

Back to List
RAMON Intelligent Scheduling System

RAMON intelligent scheduling system is a production scheduling and optimization system designed specifically for steelmaking workshops. The system integrates artificial intelligence, big data analysis, and optimization algorithms to accurately match production plans and process requirements, achieving efficient collaborative scheduling of BOFs/electric furnaces, refining furnaces, and continuous casting machines. By dynamically optimizing the steelmaking process, the system enhances production efficiency, reduces costs and energy consumption, improves steel quality, and supports intelligent production management in steel mills.

Application Scenarios

  • Optimization of steelmaking for BOF/EAF (electric arc furnace)

    By combining the ratio of molten iron and scrap steel, optimize the smelting plan and improve the BOF/EAF operation efficiency. Predict smelting time, reduce waiting time, and improve equipment utilization.

  • Optimization of scheduling for refining furnaces (LF/RH, etc.)

    Automatically align with steel grades and alloy requirements, and minimize refining cycle time.
    Optimize the molten steel flow path and reduce bottlenecks in combination with the order demand.

  • Continuous casting production scheduling

    combining the status of the molten steel and the load of the continuous casting machine.
    Improve the operating rate of continuous casting machines, reduce the retention time of molten steel, and minimize quality defects.

  • Molten steel flow and energy consumption management

    Optimize the transportation of molten iron and the turnover path of steel ladles, reduce the waiting time of steel ladles, and improve turnover efficiency.
    By combining energy consumption models, optimize the scheduling of energy sources such as gas, electricity, and oxygen to reduce production costs.

Benefits

A certain project reduced the total transfer time for ladles by 4 minutes, generating annual savings of USD 416,666.67.

Product Highlights

Deeply integrate the entire steelmaking production process to enhance operational efficiency

Technical Specifications
Production Scheduling Calculation Time < 10 seconds, 60% reduction compared with manual scheduling time
Equipment utilization increased by >15%, Overall process cycle time reduced by >6%
Production Anomaly Detection Rate ≥95%
Production Scheduling Visualization Coverage Rate 100%
Contact Us

If you are interested in our products and services, please contact us or leave a message. We are happy to assist you.

Name *
Phone *
Message *